The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning...
Month: November 2013
METHOD STATEMENT FOR TESTING & COMMISSIONING OF CHEMICAL DOSING SYSTEM (POT) FOR CHILLED WATER PIPING
The purpose of this method statement is to define the steps to implement the correct practices for the pre-commissioning & commissioning of...
Testing & Commissioning Of Chilled Water Pumps
The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for...
Nitrogen Flushing of Air Conditioning and Refrigeration Systems
Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration...
Method Statement For Copper Pipe Cutting & Jointing
The purpose of this method statement is to establish a standard procedure for the proper cutting and jointing of copper pipe by using the right...
Testing & Commissioning Of Pressurization Unit – Chilled Water
1. Purpose
The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning &...
Testing & Commissioning Of Fire Pumps
The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning...