2013
Jul
31

Inspection Checklists / Forms For Electrical Works Installation Testing & Commissioning

Below are the links for downloading the sample inspection and testing check sheets and forms which you can use for conducting the inspection of different electrical systems and activities. You can make your own forms based upon the information given here. Please

2013
Jul
31

Sample Forms & Checklists For HVAC Installation Testing & Commissioning

You can download the sample forms and checklists for different activities which you can then reuse and customize as per your requirements. Below we have given list of checklists which you can download in one go by clicking the download link given

2013
Jul
30

Flushing Procedure For Chilled Water System & Chemical Treatment

Flushing Procedure For Chilled Water System

Chilled water or cooling water system is mostly a closed system that requires strict monitoring and control of certain parameters. Water during circulation evaporates and it increases the suspended particle concentration, which in result creates scale formation and corrosion etc. Therefore the

2013
Jul
29

METHOD STATEMENT FOR TESTING & COMMISSIONING OF PRESSURIZATION UNIT

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Pressurization Unit through the guidelines contained herein so as to ensure that the job execution complies with the

2013
Jun
9

Method Statement for Installation Of Air Handling Unit AHU & FAHU

Installation of Air Handling Units AHU & FAHU

Below is the brief method of statement for the installation and testing of air handling units i.e. AHU & FAHU. On this page you can see three major sections which are: necessary tools, installation and testing procedure Other parts should be included

2013
May
15

Method Statement For Installation Of Electric Water Heater

water heater installation method statement

The procedures for the installation and fixing of electric water heater with supports and accessories shall be done as per the manufacturer’s recommended guidelines and installation instructions and as per the approved water supply drawings/layouts and detailed drawing as follows. This method

2013
May
13

Method Statement For Switchgear Installation Of MV LV HV Switchgear Panels

Method Statement For Switchgear Installation Of MV LV HV Switchgear Panels

1.0 PURPOSE The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for medium voltage switchgear panel installation & its accessories through the guidelines contained herein so as to ensure that the

error: Content is protected !!