2019
Mar
31

Safety Procedures for GRP Pipeline Installation and Lamination

Below are detailed health and safety procedures for GRP pipeline installation and lamination works. The chemical components required for the butt-strap joints of GRP pipes present certain safety and health hazards if not handled well. Following are the recommendations: Common Hazards: Resin: Liquid

2019
Mar
27

Chemical Waste Disposal Method Statement

The purpose of this method statement is to ensure pollution free environment by proper disposal of chemical waste that are hazardous to health of personnel. The procedure is applicable to all personnel involved in processing of photosensitive film and handling of chemicals.

2019
Mar
25

Radiography Testing Works Safety Method Statement

radiography testing safety method statement

This document is for the use of employees and its subcontractors, who are responsible in operations of instruments using ionising radiation. This document covers specific instructions on how to safely perform radiography related task. Please note that this method is general and

2019
Mar
15

Case Study – Total Station Surveying and Topography

Total Station Surveying

A project site was used as a case study mainly to highlight the importance of anticipating the presence of hard materials on site and the associated problems if hard materials are detected during construction work. The study was undertaken alongside the remained

2019
Mar
15

Road Markings & Markers Method Statement

Below is a brief method statement for road markings and road signs. The method will ensure the quality of work in accordance with the contract requirements and applicable local standards. Following this road work method statement will also ensure that all quality

2019
Mar
12

Asphalt Paving Method Statement

asphalt paving method statement

Below asphalt paving method statement describes the responsibilities of personnel, execution procedure, safety factors and mandatory documents for the work. The overall responsibility lies with the project manager but specifically relevant function heads are responsible for controlling the asphalt paving work quality