All paints to be used shall be those supplied by approved manufacturers. The quality of paints shall comply with MS 125 in respect of oil/ enamel paints and MS 134 in respect of emulsion paints/acrylic paint. Prior to commencement of the painting
Read Complete Method
Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the
Read Complete Method
Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality
Read Complete Method
This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any
Read Complete Method
Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss:
Read Complete Method
Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and
Read Complete Method
This health and safety procedure provides guidance and direction in identification of potential manual handing and lifting issues and prevention measures to help eliminate the risk of injury. Procedure addresses safety instructions for both projects and offices of the company, additional control
Read Complete Method
Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of
Read Complete Method