Water Leak Detection System Installation Method of Statement

Water Leak Detection System Installation Method Statement

This “Method Statement” covers the nature and type of work for Water Leak Detection System installation as per approved material submittal and project specifications and legal requirements. MEP project manager have full authority and overall responsibility to manage, supervise, control the works

2021
Feb
17

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Most accidents from roofs could have been prevented by the identification of hazards and by the provision and proper use of readily available equipment. As a high risk activity, it is important that all roof work is pre planned. Falls and falls

2021
Feb
7

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure

Bulldozer and Excavator Track Replacement Standard Procedure

Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the

2021
Jan
16

Confined Space Definition Entry & Working Procedure

confined space entry hazards and training requirements

The purpose of this safework method is to assist the organization in the identification and establishment of  standard procedure for the safe entry and work in confined space. This document addresses safety instructions for both projects and offices of the company. Additional

2020
Dec
31

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

Process Pipe Pneumatic Testing Manifold Connection Diagram

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management

2020
Dec
16

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

This method provides you guidelines for the safe use of aluminum mobile scaffolds and standard instruction applies to all applications where people are using aluminium mobile scaffold towers. Overall project manager and HSE manager are responsible for the implementation of this standard

2020
Nov
17

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to

2020
Nov
8

Download HVAC Maintenance Procedures & Schedules in Editable Formats

HVAC Preventive Maintenance Service and Troubleshooting Tips

Now you can download complete package for HVAC maintenance works. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of all hvac mechanical equipment’s and systems. Preventive maintenance is an essential part of any