Design of Reaction System for 1500 mm diameter Test Pile

The following are the main elements in the design of reaction system for 1500 mm diameter test pile.

 

  •   Design of Reaction Anchor.

 

  •   Design of Dywidag Bars.

 

  •   Design of cross beam.

 

Anchor Design

The test load                              =          1.5 x W.L = 1.5 X 21800 = 32700 KN (Comp.)

No. of anchors                            =          24 Nos.

Load / Anchor                             =          32700 / 24    =  1362.50 KN

Diameter of anchor strands          =      15.20 mm

According to FIP Code

Grade of anchor strand           =          1570 /1770 N/mm2

Allowable load/ strand            =          1.770 X 130 / 1.60    = 144 KN/ strand

No. of  strand/ anchor             =          1362.50/144    = 9.46   =   10

Provide 10 Nos. of Strands / anchors

 

Total No. of strands                =          24 x 10 = 240 Nos.

 

Load on one strand                 =          32700 / 240 = 136.25 KN < 144 KN (safe)

Total length of anchor ‘L’  = 25.60 m.

Proposed 10 Nos. strands (15.24 mm dia) of 24 anchors located as shown in the sketch.

Design For Grout Body Length

 

Load per anchor                      =          32700 / 24 KN   =  1362.50 KN

 

Safety factor                           =          2

 

Ultimate anchor load              =          1362.50 x 2  =  2725 KN

 

Required grout length(Lo)       =             Pu / ( Ao x sigma )

 

 

Nominal diameter of strands              =          15.20 mm

 

Perimeter  = Ao  =  0.0152 x p  = 0.048 m

 

Proposed No. of strands                                 =          10

 

 

Lo        =                  2.725 MN / ( 10 x 0.048 x 1.0 MN/m2)          =          5.68 m

Provide grout body of 10.00 m long

GROUT – Ground Interaction

 

Ultimate  anchor load                                   =          2725 KN

 

Proposed length of grout body                       =          10.00 m

 

According to B.S- 8081 – 1989– fig. 60 (conservative).

 

The skin friction capacity for medium dense sand   = 300 – 800 KN/m2

 

Considering an ultimate skin friction capacity of 600 KN/m2

 

Use 1500 mm diameter casing for drilling of anchor.

Pult = 0.15 x p x 10.00 x 600 KN/m2 = 2827 KN/anchor >2725 KN (safe)

Elastic Elongation Of Anchor

 

Max. load / anchor                  =          1362.50 KN

Elastic elongation                    =          I           =          (P x L) / ( E x A )

P                   =   Anchor Load                =       1362.50 KN

L                   =   Free Length of Anchor =      25.60 – 10 =15.60KN

E                   =   Young’s Modulus         =      200 KN

 

No. of strands             =          10 Nos.

Area of strands           =           (10 x 15.202 x p) / 4   = 1810 mm2

Max. elongation          =           (1362.50 x 15600 ) / 200 x 1810   = 58.72mm

Dywidag Bar Design

Dywidag bars are used to transfer the load from the anchor to the cross beam.

The Dywidag bars of steel grade 1080/1230 N/mm2

Total Test load            =          32700 KN

The working load of 36 mm dia. Bar with a F.O.S. of 1.6 = 783 KN (Data sheet attached)

No. of 36 mm Dywidag bars required   = 32700 / 783   = 41.76  = 42 Nos.

No. of Anchors                                   =          24 Nos.

No. of Dywidag Bar / Anchors              =          2 Nos.

Total No. of Dywidag bars   = 24 x 2   = 48 Nos. > 42 Nos. (safe)

Design of Cross Beam

The cross beam is capable to provide a reaction of 4000 tons to test piles. Since test load is only 3270 tones the cross beam is adequate to provide reaction load to the test pile.


Discover more from Method Statement HQ

Subscribe to get the latest posts to your email.

error: Content is protected !!

Discover more from Method Statement HQ

Subscribe now to keep reading and get access to the full archive.

Continue reading