2019
Mar
6

Safety Procedure for Erecting and Dismantling Concrete Formwork Systems

Concrete-Formwork-Installation-Method-Statement

This safe work method statement outlines conventional safety requirements for erecting and dismantling the vertical concrete forming systems. However, equipment and forming systems differ for different manufacturers and suppliers. Therefore reference must always be made to the instructions and procedures of the

2018
Dec
14

Temporary Electrical Supply HSE Procedure For Construction Site

Below procedure will help you to establish a safe standard for the installation of temporary and permanent electrical fixtures/appliances on project sites. Overhead Cables: Overhead supply from the supply point or metering point to the distribution boards on the site should be of

2018
Nov
30

Risk Assessment Procedure Step wise Guide

wet floor safety procedure

If you are willing to prepare risk assessment for your company work then this is right place to learn the risk assessment process. You will learn hazard identification, risk calculation and ultimately risk management by reducing the risk to an acceptable level.

error: Content is protected !!