2013
Aug
29

Method Statement For Installation & Testing of Sanitary Fittings / Plumbing Fixtures

Method Statement For Installation & Testing of Sanitary Fittings & Fixtures

Below is the brief Method Statement For Installation & Testing of Sanitary fittings / plumbing wares / Accessories / Plumbing Fixtures etc. This method of statement is very useful for any kind of construction project. The procedure is simple and covers all

2013
May
15

Method Statement for Installation of Electric Water Heater

water-heater-installation-method-statement

The procedures for the installation and fixing of electric water heater with supports and accessories shall be done as per the manufacturer’s recommended guidelines and installation instructions and as per the approved water supply drawings/layouts and detailed drawing as follows. This method

2013
Apr
27

Installation Method Statement Of HDPE Piping

hdpe pipe installation method statement pdf

Below is a classic method statement for the installation of HDPE piping network or domestic water supply system. Any plumbing engineer can get benefit from below method of statement for submission to consultant for a construction project. Material received at site shall

2013
Mar
31

Installation & Leakage Testing Method Statement of Drainage Piping

This page provides a precise method statement for drainage pipe installation which is useful for any kind of project. Below is list of plant & equipment used for the drainage piping installation work: Measuring tape Tool Box Measuring Tape Hack Saw Spirit

2012
Nov
12

Construction Method Statement For Installation of Chilled Water Piping System

This method statement covers on site installation of pre-fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water system. This procedure is to define the method used to ensure that the Chilled Water Pipework System installation

2012
Nov
5

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground

drainage pipe installation method statement

This method statement is applicable for all drainage pipe works underground, above ground, horizontal and vertical drainage piping for any kind of the project as specified in project specification. It is responsibility of project manager and project plumbing engineer to ensure the

error: Content is protected !!