2021
Mar
16

Water Leak Detection System Installation Method of Statement

Water Leak Detection System Installation Method Statement

This “Method Statement” covers the nature and type of work for Water Leak Detection System installation as per approved material submittal and project specifications and legal requirements. MEP project manager have full authority and overall responsibility to manage, supervise, control the works

2021
Feb
17

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Most accidents from roofs could have been prevented by the identification of hazards and by the provision and proper use of readily available equipment. As a high risk activity, it is important that all roof work is pre planned. Falls and falls

2020
Dec
31

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

Process Pipe Pneumatic Testing Manifold Connection Diagram

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management

2020
Nov
17

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to

2020
Nov
8

Download HVAC Maintenance Procedures & Schedules in Editable Formats

HVAC Preventive Maintenance Service and Troubleshooting Tips

Now you can download complete package for HVAC maintenance works. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of all hvac mechanical equipment’s and systems. Preventive maintenance is an essential part of any

2020
Oct
25

Painting Procedure for Firefighting and Fire Protection Piping Network

Fire Fighting pipe painting procedure method statement

This method of statement covers the painting procedure of firefighting and fire protection pipe, fittings and accessories for any kind of construction project. The pipe painting procedure defines the method used to ensure the painting has been carried out as per contract

2020
Oct
15

Method statement for the Installation of Medical Gases System in Hospital Project

medical gas piping system method of statement

This method statement covers the installation of medical gases system horizontal and vertical piping installations through all the areas in the hospital project. The medical gas pipes shall run horizontally in the main routing in the corridors. The vertical running will be

2020
Sep
30

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry

error: Content is protected !!