October 2019

Ventilation Fans Installation Method Statement

Ventilation Fan Installation Method Statement

This document applies to the inward site inspection, installation and inspection methods to be adopted for the ventilation fan installation. After receiving on the project site, ventilation fans shall be stored in a clean / dry place and adequate covering by tarpaulin sheets to be provided to protect the equipment from deposition of construction dust […]

Ventilation Fan Installation Method Statement Read More »

HVAC Method Statements, Method Statements
Pipe Jacking Method Statement Using Automatic Tunneling Machine

Pipe Jacking Method Statement Using Automatic Tunneling Machine

The objective of this method statement is to define the installation sequence of casing pipe by means of Pipe Jacking using Herrenknecht Automatic Tunneling Machine with Slurry Material Removal (AVN machines). Table of Content Soil investigation. Identification and location of existing utilities. Responsibilities Labor, equipment’s and material required to complete the work. Handling and disposal

Pipe Jacking Method Statement Using Automatic Tunneling Machine Read More »

Civil Engineering Methods
End Connection dimensions for y strainer

YStrainer Installation and Maintenance Guidelines

This page is providing you some important guidelines for installing and maintaining the Y-Strainers. These tips shall help you in achieving the quality work and right first time. If you want to read a full method statement for strainer installation you can search our website. First we shall see some useful installation tips and this

YStrainer Installation and Maintenance Guidelines Read More »

Method Statements, Preventive Maintenance, Technical Articles
error: Content is protected !!
Scroll to Top