2014
Jan
19

Testing & Commissioning Of Booster Transfer & Circulation Pump Set

domestic water pump method statement

Pre-commissioning checks prior to start-up – Mechanical Checks Check and inspect the installation of Water Pumps is complete, verify the installation as per approved drawings. Verify compliance to the attached manufacturer’s installation instructions. Obtain installation certification from manufacturer or their authorized representative. Check and ensure

error: Content is protected !!