The work specified herein includes the design, documentation, furnishing, and installation of earth retention systems for excavations. The earth retention system shall be either singular or multiple stages comprised of soldier piles and laggings, sheet pile wall and bracing, raker or timber
Read Complete Method
Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause
Read Complete Method
This method statement covers on site installation of pre-fabricated ductwork system for kitchen exhaust ducting. Procedure defines the method that will make sure that prefabricated kitchen exhaust ducting including support/bracketing, in line equipment installation and final connections are correct and acceptable, and
Read Complete Method
Maximum fall incidents take place due to improper use of scaffolds and ladders especially in construction industry when people are working at height. There are plenty of means used in construction sites for performing the work at height that include rigid stationary
Read Complete Method
1.0 PURPOSE The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for medium voltage switchgear panel installation & its accessories through the guidelines contained herein so as to ensure that the
Read Complete Method
This page presents precise mechanical method statement that covers ahu testing and commissioning procedure. A full method statement shall have many other sections and details depending upon the type and size of units and projects. Prior to testing & commissioning ensure that
Read Complete Method