2014
Mar
12

Civil Method Statement for RCC Columns and Shear Wall Construction

Below is a general method statement for illustrative purpose, there shall be different values for different parameters depending upon the type of project and climatic situations, which should be followed all the time. EQUIPMENT’S & TOOLS REQUIRED Hand saw, wire cutter, brush, Shovel

2014
Mar
11

Method Statement for Tiling Work

method statement for tiling work

Below method statement is equally useful for the tiling work on walls and on floors. Both methods are distinguished for easy study of our visitors and for them to understand the procedure of installation of tiles. Method for Tiling at Wall Before

2014
Jan
20

Best Method of Block Work For Construction

wall block work

Block work is most important work for the construction of any building. Concrete blocks are very common building components that are used worldwide. There is a wide variety of size and type used within the construction industry today. Let us look at some

2014
Jan
20

Method Statement for Concrete Works

This method statement describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete or concrete pouring all quality checks are to be completed