Category Archives: Plumbing Method Statements

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to meet the requirements of applicable codes and client’s project specifications for pipe fabrication… Read More »

Painting Procedure for Firefighting and Fire Protection Piping Network

This method of statement covers the painting procedure of firefighting and fire protection pipe, fittings and accessories for any kind of construction project. The pipe painting procedure defines the method used to ensure the painting has been carried out as per contract specifications and industry best practices. It gives details of how the work will… Read More »

Method statement for the Installation of Medical Gases System in Hospital Project

This method statement covers the installation of medical gases system horizontal and vertical piping installations through all the areas in the hospital project. The medical gas pipes shall run horizontally in the main routing in the corridors. The vertical running will be through the pipes drops to the medical gases outlets, bed head units and… Read More »

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry out the work and what health and safety issues and controls are necessary.… Read More »

Preventive Maintenance & Breakdown Maintenance Plans and Procedures [Download]

If you are looking for preventive maintenance & breakdown maintenance program, plans, schedules and procedures then this is right place. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of electrical and mechanical equipment’s and systems. Preventive maintenance is an essential part of any facility management works.… Read More »

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

This method statement procedure covers the Testing and Commissioning of sprinkler and firefighting standpipe systems installed at project, this will also ensure proper workmanship and that the work conforms to contract documents and applicable NFPA regulations. Commissioning manager will have the all the responsibility for the execution  of the Testing and Commissioning  activities, quality  and… Read More »