Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout
Read Complete Method
This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible
Read Complete Method
Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause
Read Complete Method
This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. Project manager is overall responsible for the implementation of this method during the project civil works
Read Complete Method
This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on