The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the
Read Complete Method
The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating
Read Complete Method
Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs
Read Complete Method
This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is
Read Complete Method
Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall
Read Complete Method