2024
Oct
9

Heat Exchanger Installation Testing and Commissioning Method Statement

Heat Exchanger Installation Testing and Commissioning Method Statement

Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat  Exchanger’s as indicated unless deviations

2024
Sep
30

Scaffolding Method Statement

Scaffolding Method Statement

Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites

2024
Sep
7

Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement

Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement

The purpose of this method statement is to define the steps to implement the correct practices for the installation of chemical dosing system (pot) for chilled water piping. By following this procedure contractor shall ensure that the performance of the chemical dozing

2024
Aug
29

Laboratory Gas Piping System Testing & Commissioning Method

This method statement covers all processes related to Testing & Commissioning of Laboratory Gas System, procedure is to be read in conjunction with the relevant ITP, outlining the responsibility and the quality verification to be performed by various parties. Project manager is

2024
Aug
29

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

This method statement is applicable for the Testing & Commissioning of Fan Coil Units for the project as mentioned in the project specifications & approved shop drawings. Before commencement of FCU testing & commissioning activity, the supervisor must ensure that pre-commissioning of

2024
Aug
24

Split Unit Testing and Commissioning Method Statement

split unit ac testing and commissioning

Below is a precise HVAC method statement that briefly explains testing and commissioning of split unit ac air conditioner. The test will be commenced after Split Unit installation and power supply panel T&C activities completed. All areas and fan inlet & outlet

2024
Aug
21

Method Statement for Hot Insulation

This method statement covers the general requirements for materials and application of external thermal insulation on the hot surfaces of piping and equipment’s as applicable on the project or facilities i.e. boilers, refineries etc. The external surface of equipment, piping and machinery