Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Damaged Cracked Concrete Repair Of Large Cracks

Method Statement for Damaged Cracked Concrete Repair of Large Cracks

This procedure shall apply to the repair of all defective cracked concrete in large quantities, using high strength, free flowing, cementitious micro concrete  of size 40 – 300 mm thickness. Concrete Preparation The areas to be repaired are to be as shown on the drawings or as indicated by the Client/Consultant. Affected areas are to be […]

Method Statement for Damaged Cracked Concrete Repair of Large Cracks Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
standby diesel generator installation instruction

Standby Diesel Generator Installation Instructions

Before the installation of standby generator the equipment shall be inspected and checked against the relevant general arrangement drawing, approved material submittal. Doors and Panels shall be checked to ensure proper opening and closes. Generator rating, name plate details, Breaker ratings, protection devices, indicators, voltmeter and ammeters shall be checked. The Presence of all identifying

Standby Diesel Generator Installation Instructions Read More »

Electrical Method Statements

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry out the work and what health and safety issues and controls are necessary.

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes Read More »

Plumbing Method Statements
PVC Pipe & Conduit Installation

Method Statement for PVC Electrical Conduit – PVC Pipe Installation

Plastic electrical pvc conduits are common item which is useful for electrical wiring using pvc pipe. Since these electrical conduits are not much stronger as compared to metallic GI conduits therefore need proper handling and storage. Plastic electrical conduit pipes while unloading shall be lowered properly, not dropped to the ground. While during the storage,

Method Statement for PVC Electrical Conduit – PVC Pipe Installation Read More »

Electrical Method Statements

Lead Acid Batteries Installation Operation & Maintenance

Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover may occur. As the batteries are supplied charged, storage time is limited. In

Lead Acid Batteries Installation Operation & Maintenance Read More »

Construction Method Statements, Electrical Method Statements, Method Statements, Testing & Commissioning
split unit ac testing and commissioning

Split Unit Testing and Commissioning Method Statement

Below is a precise HVAC method statement that briefly explains testing and commissioning of split unit ac air conditioner. The test will be commenced after Split Unit installation and power supply panel T&C activities completed. All areas and fan inlet & outlet should be cleared of waste materials and any other obstruction. The purpose of

Split Unit Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Testing & Commissioning

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs and approved material submittals. Prior to installation of drainage accessories, the supervisor  and

Drainage Accessories Installation Method of Statement Read More »

Plumbing Method Statements

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves

SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED: The wrap around heat shrinkable cable sleeves used shall be as per approved

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves Read More »

Construction Method Statements, Electrical Method Statements, Method Statements
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Sequence of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System

Below is detailed sequence of operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System. Primary/Secondary Chilled Water Pumps The secondary chilled water pump (SCHWP) sets will be controlled through VFD drives to maintain the desired system differential pressure. A minimum of 3 differential pressure transducers will be connected to the DDC controllers of

Sequence of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System Read More »

Building Management System, HVAC Method Statements