2024
Apr
11

Central Battery Emergency Lighting System – Electrical Installation Method Statement

This document describes the methodology for the installation of emergency Lighting central battery System in any kind of project. Following this electrical installation method shall ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution

2024
Apr
1

MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable

2024
Mar
30

Driven Piles Installation Method Statement

Driven Piles Installation Method Statement

The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling

2024
Mar
27

Mechanical Engineering Interview Questions and Answers

Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Below we have given around 70 questions and answers that can be helpful for mechanical engineer interview.  Q.1) What is the Unit of Heat? Units: BTU (British Thermal Units) 1BTU: It is the amount of energy required to raise 1 Degree Fahrenheit

2024
Mar
24

Best Sanitary Installation Method Statement

Best Sanitary Installation Method Statement

This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the approved design, drawings and material submittals. Prior to the installation of Sanitary Wares, the supervisor and foreman will verify and ensure

2024
Mar
7

Piping Installation, Welding & Fabrication Method Statement

Piping Installation, Welding & Fabrication Method Statement

TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC REQUIREMENTS HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a

2024
Jan
26

Generator Installation Method Statement Including Fuel Tank Installation at High Level

standby diesel generator installation instruction

This method statement covers the generator and fuel tank installation for any kind of project. Prior to commencement of the works, all activities shall be coordinated with Project Safety Officer and PTW holder, who will assess the associated risks, and monitor the

2024
Jan
4

Termination of Fiber Optic Cables

Mass (Ribbon) Fusion Splicing

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be