Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Laboratory Gas Piping System Testing & Commissioning Method

This method statement covers all processes related to Testing & Commissioning of Laboratory Gas System, procedure is to be read in conjunction with the relevant ITP, outlining the responsibility and the quality verification to be performed by various parties. Project manager is overall responsible to make sure that all installations and testing activities are done […]

Laboratory Gas Piping System Testing & Commissioning Method Read More »

Method Statements, Piping Method Statements, Testing & Commissioning
distribution board testing procedure

Main Sub-Main Distribution Boards Testing and Commissioning Procedure

Below is a precise method statement for Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the Contractor shall visually inspect the installation and satisfy that the

Main Sub-Main Distribution Boards Testing and Commissioning Procedure Read More »

Electrical Method Statements, Testing & Commissioning

Cooling Tower Installation Method Statement

This HVAC method Statement covers the Installation of Cooling Towers in line with project requirements, as indicated in the approved shop drawings, specifications and manufacturer’s instructions. All the materials received at site shall be strictly as per the approved technical material submittal for cooling towers. Shall be inspected upon receipt & approved by the engineer

Cooling Tower Installation Method Statement Read More »

HVAC Method Statements

Sequence of Operation for Sump Pumps

1. Introduction On this page you can find the detailed Sequence of Operation (SOO) for sump pump systems which is used in commercial, residential, industrial, and infrastructure projects. Main purpose of the sump pump system is to automatically collect, monitor, and discharge accumulated groundwater, stormwater, condensate water, or wastewater from sump pits, plant rooms, basements,

Sequence of Operation for Sump Pumps Read More »

Building Management System, Plumbing Method Statements

Method Statement For Repairing Screed Surface

Following equipment shall be arranged: Hand tools Air Compressor Wire brush Slow speed drill with Fosroc MR4 mortar mixing paddle Finishing Sponge & rubber gloves SURFACE PREPARATION Mark out the defective area, remove loose sand cement materials and all contamination from screed  such as dust, oil & grease if any up to the perimeter of

Method Statement For Repairing Screed Surface Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Shell and tube heat exchanger cutaway

Heat Exchanger Installation Testing and Commissioning Method Statement

Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat  Exchanger’s as indicated unless deviations to layout are approved on coordination drawings. Plate Heat Exchanger shall be installed

Heat Exchanger Installation Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Preventive Maintenance, Testing & Commissioning
Exhaust Fan Installation Method of Statement

Testing & Commissioning Procedure for Ventilation and General Exhaust Fans

1. Introduction This Testing & Commissioning Procedure defines the systematic method for inspection, testing, startup, balancing, and performance verification of ventilation and general exhaust fan systems installed in commercial, residential, industrial, and infrastructure projects. The purpose of this procedure is to ensure that all ventilation and exhaust fans operate safely, efficiently, and in accordance with

Testing & Commissioning Procedure for Ventilation and General Exhaust Fans Read More »

HVAC Method Statements, Testing & Commissioning
AC Duct Cleaning Method Statement for HVAC Ducts & Accessories

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories

The purpose of this ac duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. HVAC duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting system. Following tools shall be arranged before starting the ac duct cleaning works of HVAC

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories Read More »

Duct Works, HVAC Method Statements

Storm Drainage Water Piping Network Installation Method Statement

1. Purpose The purpose of this method of statement is to define the safe and systematic procedure for the installation, testing, inspection, and commissioning of storm drainage water piping networks for construction projects. By implementing this storm drainage water piping network method statement contractor shall ensure that all storm water drainage works are completed in

Storm Drainage Water Piping Network Installation Method Statement Read More »

Plumbing Method Statements