Method Statement for Piling Works Constructions – Drilling

Below is a brief method statement of piling work that can be used for any kind of project piling works. A crawler mounted piling rig will be used to install bored cast in situ piles of dia 1200 mm. The procedure for the construction of bored piles, with temporary casing under bentonite / water  support […]

Method Statement for Piling Works Constructions – Drilling Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Pan Tilt & Zoom or PTZ CCTV Camera

CCTV Camera Testing & Commissioning Procedure

The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements of the client. Below is the list of equipment that shall be used

CCTV Camera Testing & Commissioning Procedure Read More »

Construction Method Statements, Electrical Method Statements, Method Statements, Testing & Commissioning
domestic water treatment

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation

Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings and BOQ related to the area of installation and ensure that required

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation Read More »

Method Statements, Plumbing Method Statements

Car Parking Management System Testing Commissioning Procedure

Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety rules. System units may be used only for their intended purpose, as specified

Car Parking Management System Testing Commissioning Procedure Read More »

Construction Method Statements, Electrical Method Statements, Method Statements, Testing & Commissioning

Bypass Terminal Reheat Units Testing & Commissioning Method

Pre-Commissioning Procedure Before starting the commissioning activities check and ensure that bypass Terminal Reheat units are installed as per the approved shop drawings and manufacturer’s instructions and approved. Check that sensing grids tubing connection from the grids to the transducers are correct & secure. Check for proper mounting of the actuator on the body of

Bypass Terminal Reheat Units Testing & Commissioning Method Read More »

Construction Method Statements, Duct Works, HVAC Method Statements, Method Statements

Lead Acid Batteries Installation Operating Maintenance Instructions

Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover may occur. As the batteries are supplied charged, storage time is limited. In

Lead Acid Batteries Installation Operating Maintenance Instructions Read More »

Construction Method Statements, Electrical Method Statements, Method Statements, Testing & Commissioning

Method Statement for Water Tank Installation – GRP Water Tank

Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings, specifications and approved material submittal. Installation contractor shall properly coordinate with the civil

Method Statement for Water Tank Installation – GRP Water Tank Read More »

Method Statements, Plumbing Method Statements