Chilled Water Pipe Installation Method Statement

Chilled Water Pipe Installation Method Statement

This method statement covers on site installation of pre fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water pipe system. By implementing this mechanical method statement on a project site contractor shall make sure that the chilled water piping system installation is as per project requirements i.e. specifications,

Chilled Water Pipe Installation Method Statement Read More »

Construction Method Statements, HVAC Method Statements, Piping Method Statements

BMS System Testing & Commissioning for DDC Panel and FCU

Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in the installation details of each instrument as well as instructions from supplier. Check

BMS System Testing & Commissioning for DDC Panel and FCU Read More »

Building Management System, HVAC Method Statements, Method Statements, Testing & Commissioning
Method Statement For HVAC Ductwork Insulation and Acoustic Lining

Ductwork Insulation and Acoustic Lining Method Statement

This hvac method statement covers on site installation of ductwork insulation for pre fabricated ductwork systems manufactured from hot dipped galvanized steel sheet in line with the SMACNA requirements. Method statement describes best procedure to make sure that ductwork insulation and acoustic lining for prefabricated ducting, bracketing, and in line equipment installation and final connections

Ductwork Insulation and Acoustic Lining Method Statement Read More »

Duct Works, HVAC Method Statements

Aluminium HVAC Ductwork Installation Method Statement

Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices. The procedure gives details of how the ductwork will be carried out and

Aluminium HVAC Ductwork Installation Method Statement Read More »

Construction Method Statements, HVAC Method Statements, Method Statements
Ductwork & Accessories Installation Method Statement

Ductwork and Accessories Installation Method Statement

Ducts in any HVAC system are used for distribution of air which can be for the purpose of cooling, providing fresh air or for the exhaust purpose. Commonly the HVAC ductwork is fabricated using GI sheets, but there are different types of air conditioning ducts available in the market. Below is a list of the

Ductwork and Accessories Installation Method Statement Read More »

Duct Works, HVAC Method Statements, Method Statements