Sample Quality, Health, Safety and Environmental QHSE Policy

QHSE policy is a top level document that reflects the commitment of top management of a company to its intention of implementing the measures for achieving the quality and HSE targets and objectives. Above the policy there are two more documents which most organizations keep i.e. Mission and vision of the company. In additions a… Read More »

Temporary Electrical Supply HSE Procedure For Construction Site

Below procedure will help you to establish a safe standard for the installation of temporary and permanent electrical fixtures/appliances on project sites. Overhead Cables: Overhead supply from the supply point or metering point to the distribution boards on the site should be of a robust pattern and preferably pliable and wire armoured with a further outer… Read More »

Soil Compaction Test Methods as per BS 1377

On this page we can learn three different soil compaction test methods that are specified in BS 1377. Soil compaction is very important step for any structure because if compaction is not done properly. After the soil compaction is complete a sample is taken in order to fulfill the required quantity of total material as… Read More »

Parapet Construction Method Statement

1. Scope This method statement is developed and issued to describe the procedure for parapet construction works to ensure that the work is planned and performed in accordance with technical specification and drawings. 2. Responsibilities The Project Manager will be responsible for global activities The work will be carried out under the responsibility of Construction… Read More »

Health Safety Environment HSE Construction Site Establishment Procedure

The purpose of this procedure is to identify the key elements which need to be considered when setting up a new construction site and implementing the administrative arrangements for the start up of any project. Prior to commencement on site due consideration needs to be given for proper planning for safety, health and environmental requirements.… Read More »

Plunge Column Construction Method Statement

PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management and Barricading SHE Measures. Design and Drawings Site Establishment Surveying Pre-excavation Boring into… Read More »

Quality, Health, Safety and Environment QHSE Explained

The term QHSE is used as abbreviation of Quality, Health, Safety and Environment in most parts of the world. Sometimes environment is replaced by environmental. These four components combine together to form an integrated corporate management approach and according to this approach all workplace accidents are caused by human error and we can eliminate, reduce, isolate and control these workplace accidents by… Read More »

Method of Statement for Traffic Diversion

This method statement introduces the proposed activities to be undertaken and acts as a general methodology for traffic diversion during road construction in the project site. This has been prepared to identify the work stages and the construction methodology for ensuring the works are carried out in compliance with contract requirements. This method statement describes… Read More »