2018
Dec
14

Temporary Electrical Supply HSE Procedure For Construction Site

Below procedure will help you to establish a safe standard for the installation of temporary and permanent electrical fixtures/appliances on project sites. Overhead Cables: Overhead supply from the supply point or metering point to the distribution boards on the site should be of

2018
Dec
11

Parapet Construction Method Statement

parapet construction method statement

1. Scope This method statement is developed and issued to describe the procedure for parapet construction works to ensure that the work is planned and performed in accordance with technical specification and drawings. 2. Responsibilities The Project Manager will be responsible for

2018
Dec
9

Plunge Column Construction Method Statement

PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management