This procedure defines the work method for installation and lamination of GRP Pipe for any kind and size of the project. The purpose of this procedure is to set out the requirements and methods for installation of GRP glass reinforced plastic pipe
Read Complete Method
This access control system installation method statement provides steps for the installation of access control security system in order for operatives to understand the work to be executed, how it is to be executed while making references to other technical standards and relevant
Read Complete Method
Below is a precise method statement for the installation of aluminium windows and doors including the glazing works. The method of statement describes the sequence of events from the receipt of the order through the completion of the Aluminium windows and doors
Read Complete Method
Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment
Read Complete Method
Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting
Read Complete Method
You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be
Read Complete Method
The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at
Read Complete Method
This method statement is applicable for the testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Electrical Toolbox Box spanner set Pipe wrench Pre Commissioning Requirements
Read Complete Method