The BMS provides a vehicle for the visibility of plant failure, patterns, annunciation of alarms and the reporting function. In particular it shall provide the standard functions stated below: Alarms shall be generated under the following conditions: Digital input contact change from
Read Complete Method
Below sequence of operation is for Variable Volume Type FAHU with Plate Heat Recovery system. The system shall be variable volume package Fresh Air Handling Unit. The scope of the unit shall consist of: Supply Side accessories Intake motorized damper Panel (Pleated) Filter Bag
Read Complete Method
The design of the BMS shall be capable of providing a range of user interfaces including the main server and client computers. All communications between the user and the system shall be in clear language, without reference to special code or codes. It
Read Complete Method
The programmable controllers shall be 16bit type or more of the fully intelligent type, capable of performing all Control and Energy Management functions assigned to them, independent of any other BMS equipment. Programmable controllers may be of modular or fixed hardware construction
Read Complete Method
Below is very brief road construction work method statement that outlines the complete process from laying the sub base to the laying of asphalt to achieve final product or outcome. The scope for pavement for the road construction consists of sub-base of
Read Complete Method
The purpose of this roadworks method statement is to describe the activities, sequence and methods that are mandatory for carrying out the standard placement of subbase and road base for a project. The sequence of the road work activities shall remain in three
Read Complete Method