Below are the steps or method statement for SMATV installation & testing for complete SMATV system in a building or project. PURPOSE: The purpose of this method statement is to identify the requirements for installation & testing of SMATV system as per
Read Complete Method
Below is the painting method statement procedure for doing the painting works for internal wall painting. This safe work method statement for painting is developed for general purpose and can be customized as required by your project. Below tools are required for
Read Complete Method
The purpose of this method statement is to define the procedure for Installation, Testing and Commissioning of UPS. Also to ensure that agreed procedures are implemented during execution of the previously described or associated work. Scope of this method statement covers material
Read Complete Method
Below is a general method statement for illustrative purpose, there shall be different values for different parameters depending upon the type of project and climatic situations, which should be followed all the time. EQUIPMENT’S & TOOLS REQUIRED Hand saw, wire cutter, brush, Shovel
Read Complete Method
Below method statement is equally useful for the tiling work on walls and on floors. Both methods are distinguished for easy study of our visitors and for them to understand the procedure of installation of tiles. Method for Tiling at Wall Before
Read Complete Method
If you are willing to submit a project hse plan then this page is designed in order to provide you an overview of the components of a project HSE plan. The hse or safety plan is a very important document created at
Read Complete Method