Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

concrete repair shotcrete method statement

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy)

Concrete repair refers to modification of structure which is damage in its appearance or serviceability. It also involves to restore the structure partly or wholly, the pre-existing characteristics of serviceability, load-bearing capacity and if necessary, to improve its durability. Concrete structures deteriorate due to a number of processes leading to cracking and spalling of the […]

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy) Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works
excavation-requirements

Method Statement for Ground Preparation of Excavations & Service Trenches

This document covers excavation and ground preparation for the roadway and service trenches and shall include all excavation, shaping and sloping necessary for the construction, preparation and completion of all subgrade, shoulders, slopes, gutters, intersections, approaches, entrances and trenches in conformity to the alignment, grades, and cross-sections shown on the drawings or established by the

Method Statement for Ground Preparation of Excavations & Service Trenches Read More »

Civil Engineering Methods, Method Statement for Civil Works

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at site. If found the materials available at site, the foreman shall take permission

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Installation-of-Steel-Structure-method-statement

Procedure for Installation of Steel Structure for Pump Rooms

The following Method Statement describes the procedure and equipment required for the installation of steel structure for pump room. Following equipment shall be arranged: Lifting Equipment: Tower Crane (if available) To lift the beams/Purlins structure from ground floor to the roof where  the area of installation is located. JCB or Fork Lift To bring the beams

Procedure for Installation of Steel Structure for Pump Rooms Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements