2012
Dec
16

Standing Procedure For Liter Weight of Cement Clinker

Procedure For Liter Weight of Clinker The liter weight of clinker is a good measure of burn-ability by calculating the density of the clinker.  The size of clinker for liter weight is between 5 & 10 mm. A clinker of density approximately 1100 g/ltr

2012
Nov
29

Testing & Commissioning Method Statement For Building Management System BMS

Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in

2012
Nov
14

What is A Method of Statement?

What is a method of statement? this is a question many people come across while they are working in the field of a process, manufacturing or construction. A method statement as its name implies is a step wise statement or method described

2012
Nov
12

Construction Method Statement For Installation of Chilled Water Piping System

This method statement covers on site installation of pre-fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water system. This procedure is to define the method used to ensure that the Chilled Water Pipework System installation

2012
Nov
10

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment

cable connections and termination method statement

1. Purpose This Method statement covers the installation and final electrical connections to the MV and LV equipment at any electrical project site. All the electrical installation work will be in accordance with the project electrical specifications. 2. Scope of Work This procedure

2012
Nov
6

Method Statement For HVAC Ductwork Insulation and Acoustic Lining

Method Statement For HVAC Ductwork Insulation and Acoustic Lining

1. PURPOSE This method statement covers on site installation of insulation for pre-fabricated duct-work systems manufactured from hot dipped galvanized steel sheet in line with the SMACNA requirements. 2. SCOPE OF WORK This method statement is to define the best method to

2012
Nov
5

HVAC DuctWork & Accessories Installation Method Statement

Ducts in any HVAC system are used for distribution of air which can be cooled, fresh or exhaust purpose. Commonly the HVAC ductwork is fabricated using GI sheets. There are heaps of different types of air conditioning HVAC duct available on the