Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Cathodic Protection System for Storage Tanks Installation Method Statement

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and […]

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure Read More »

Construction Method Statements, Method Statement for Civil Works, Method Statements, Plumbing Method Statements, Stainless Steel Fabrication
jointing procedure using solvent cement

Installation Method Statement for Water Feature Piping Equipment and Accessories

Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality and site safety plan. They shall ensure that adequate resources and personnel are

Installation Method Statement for Water Feature Piping Equipment and Accessories Read More »

Plumbing Method Statements
Method Statement for Structured Cabling System Installation

Method Statement for Structured Cabling System Installation

This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any contractor to carry out works under main contractor must comply with this method

Method Statement for Structured Cabling System Installation Read More »

Electrical Method Statements
Pressure Vessel Steel Tank Fabrication Welding General Steps

Pressure Vessel Steel Tank Fabrication Welding General Steps

Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of safework method statement. This safety briefing shall take the form of a short

Pressure Vessel Steel Tank Fabrication Welding General Steps Read More »

Construction Method Statements, Method Statements, Stainless Steel Fabrication

General Civil Work Method Statement for Roads & Building Construction

Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout with the help of ‘Total Station’ or any other survey instrument as given

General Civil Work Method Statement for Roads & Building Construction Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Method of thermal insulation and Lagging for Pipe Elbow

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment.

Method Statement for Installation of Thermal Insulation on Pipes Read More »

Duct Works, HVAC Method Statements, Method Statements, Technical Articles
Method of Statement for Protection Screed of Waterproofing Membrane

Method of Statement for Protection Screed of Waterproofing Membrane

This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. Project manager is overall responsible for the implementation of this method during the project civil works related to Screeding works. The site engineers are responsible for proper execution, arrangement,

Method of Statement for Protection Screed of Waterproofing Membrane Read More »

Method Statement for Civil Works