Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

GCB Generator Circuit Breaker Installation Method Statement

GCB Generator Circuit Breaker Installation Method Statement

Purpose of this method statement is to define the sequence of GCB generator circuit breaker installation and safe execution of the job. Procedure applies for GCB transportation, handling, and installation at electrical building / roof where these activities will be performed as per the project requirements. Arrange below mentioned equipment before installation of generator circuit […]

GCB Generator Circuit Breaker Installation Method Statement Read More »

Construction Method Statements, Electrical Method Statements, Method Statements
Demolition-Method-Statement

Method Statement for Demolition Works

Below is precise method statement for demolition works that has been prepared to demonstrate the safe working method for the soft strip of internal fixtures/fixings and identified items, asbestos removal and demolition of the existing structure. This safework method is to be read in conjunction with provided drawings and Hazard surveys. This method statement is

Method Statement for Demolition Works Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Occupational Health and Safety

Download Method Statement for Anti Termite Treatment

Download Method Statement for Anti Termite Treatment  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included

Download Method Statement for Anti Termite Treatment Read More »

Method Statement for Civil Works
Method of Statement for Protection Screed of Waterproofing Membrane

Download Method Statement for Water Proofing Sub Structure

Professional Substructure Water Proofing Method Statement Ensure leak-free construction and consultant-approved waterproofing works with this professionally prepared Substructure Water Proofing Method Statement package. This complete documentation package is designed for contractors, waterproofing specialists, QA/QC engineers and project teams handling residential, commercial and industrial waterproofing applications. The package includes all required procedures, quality forms, inspection documents

Download Method Statement for Water Proofing Sub Structure Read More »

Method Statement for Civil Works
Fan Coil Unit (FCU) Installation Method Statement

Method of Statement For Installation of Fan Coil Units and Packaged Air Conditioning Units

Below is mechanical method statement that is prepared in order to make sure that site installation of all types of Fan Coil Units and Packaged Air Conditioning Units and associated refrigerant pipework is done as per applicable requirements and manufacturer instructions. Procedure defines the method that will be used to ensure that the FCU &

Method of Statement For Installation of Fan Coil Units and Packaged Air Conditioning Units Read More »

HVAC Method Statements

Method Statement for Insulation & Cladding of CHW Chilled Water Pipe

A precise chilled water pipe insulation procedure is given below: Check all required approved chilled water pipe insulation materials are readily available on site. Install the pipe insulation according to this method statement, taking into consideration the manufacturer instructions as per material submittal. Ensure all insulation materials are in dry condition at all times, especially

Method Statement for Insulation & Cladding of CHW Chilled Water Pipe Read More »

HVAC Method Statements

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE

TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that might be damaged by the test pressure shall be isolated, removed, bypassed or

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE Read More »

HVAC Method Statements, Pressure Testing, Testing & Commissioning
Scroll to Top