Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Emergency Lighting System Installation Method of Statement

Electrical Installation Method Statement for Central Battery Emergency Lighting System

This document describes the electrical installation methodology for emergency lighting central battery system in any kind of project. Following this electrical installation method shall ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and project documents […]

Electrical Installation Method Statement for Central Battery Emergency Lighting System Read More »

Electrical Method Statements
Water Filtration System Testing and Commissioning Method Statement

Water Filtration System Testing and Commissioning Method Statement

This method statement is applicable for Testing & Commissioning of Multimedia Water Filtration System which is part of domestic water supply system. The water filtration system is used to filter the suspended particles in the water and mostly in the residential and commercial building these are installed in the mechanical floor for the purpose of

Water Filtration System Testing and Commissioning Method Statement Read More »

Method Statements, Testing & Commissioning
Preventive Maintenance & Breakdown Maintenance Planning & Procedures [Download]

Preventive Maintenance & Breakdown Maintenance Plans and Procedures [Download]

If you are looking for preventive maintenance & breakdown maintenance program, plans, schedules and procedures then this is right place. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of electrical and mechanical equipment’s and systems. Preventive maintenance is an essential part of any facility management works.

Preventive Maintenance & Breakdown Maintenance Plans and Procedures [Download] Read More »

HVAC Method Statements, Preventive Maintenance
Variable Air Volume VAV Installation Testing and Commissioning Method Statement

Variable Air Volume Installation Testing and Commissioning Method Statement

This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV installation and testing activities: Mechanical Tool Box Electric Drill Machine Step Ladders Threading

Variable Air Volume Installation Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
cable management diagrams

Cable Management Standard Procedure for Server Rooms

Cable management is a key component of Data Center and Network Management. It refers to an important step during the installation of building services (i.e. electrical services especially ELV systems) and the subsequent installation of equipment providing means to efficiently secure electrical, data, and other cables. For data cables, once an errant port has been

Cable Management Standard Procedure for Server Rooms Read More »

Electrical Method Statements, Method Statements
Clean Agent Fire Suppression System Best Installation Method Statement

FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement

This procedure covers installation and inspection of clean agent fire suppression system, the procedure is for FM 200 but can be useful for many other systems like Novec, Ansul etc. Quality of clean agent fire suppression system installation and materials at site will be ensured by project team consisting of a Project Manager, Project Engineers,

FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement Read More »

Fire Suppression System, Method Statements, Testing & Commissioning
Cathodic Protection System for Storage Tanks Installation Method Statement

Storage Tank Fabrication Erection and Testing Method Statement

This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in accordance with the project specifications to achieve satisfactory completion of the whole process.

Storage Tank Fabrication Erection and Testing Method Statement Read More »