Chilled Water Pump Testing & Commissioning Method Statement

Below is a precise testing and commissioning method statement for chilled water pumps on a project site. The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of CHW chilled water pumps. By following the guidelines […]

Chilled Water Pump Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground

This method statement is applicable for all drainage pipe works underground, above ground, horizontal and vertical drainage piping for any kind of the project as specified in project specification. It is responsibility of project manager and project plumbing engineer to ensure the availability of coordinated drawings and the required materials as per the project specifications.

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements
Concrete Formwork Method Statement

Concrete Formwork Method Statement

The purpose of this document is to lay down the systematic procedures for the various activities required for concrete formwork to ensure that all works are carried out in accordance with the approved shop drawings and contract specifications. This civil method statement is a general outline for fabrication and use of formwork for any kind

Concrete Formwork Method Statement Read More »

Civil Engineering Methods, Method Statement for Civil Works
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of chilled water pressurization unit through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to the satisfactory level of

Chilled Water Pressurization Unit Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
cable connections and termination method statement

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment

1. Purpose This Method statement covers the installation and final electrical connections to the MV and LV equipment at any electrical project site. All the electrical installation work will be in accordance with the project electrical specifications. 2. Scope of Work This procedure covers the method for all the cable pulling, electrical connections and terminations for

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment Read More »

Electrical Method Statements
Copper Piping Method Of Statement For Installation

Copper Pipe Joint Method Statement | Flaring & Swaging

The purpose of this method statement is to establish a standard procedure for the proper cutting and jointing of copper pipe by using the right tools and procedure i.e. flaring or swaging joints. Below method will also serve as guideline for newly hired employee which will be dealing with air conditioning unit maintenance activity or

Copper Pipe Joint Method Statement | Flaring & Swaging Read More »

HVAC Method Statements, Method Statements, Piping Method Statements

Transformer Installation Method of Statement for any type of Project

Below electrical method statement explains and covers the transformer installation procedure for any kind and size of the project. By following this method of statement the electrical installation team shall ensure that installation of transformer is done as per the applicable specifications, codes and standards also ensuring the compliance with the manufacturer installation manuals/instructions. Necessary

Transformer Installation Method of Statement for any type of Project Read More »