Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Car Parking Management System Testing Commissioning Procedure

Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety rules. System units may be used only for their intended purpose, as specified […]

Car Parking Management System Testing Commissioning Procedure Read More »

Construction Method Statements, Electrical Method Statements, Method Statements, Testing & Commissioning

Bypass Terminal Reheat Units Testing & Commissioning Method

Pre-Commissioning Procedure Before starting the commissioning activities check and ensure that bypass Terminal Reheat units are installed as per the approved shop drawings and manufacturer’s instructions and approved. Check that sensing grids tubing connection from the grids to the transducers are correct & secure. Check for proper mounting of the actuator on the body of

Bypass Terminal Reheat Units Testing & Commissioning Method Read More »

Construction Method Statements, Duct Works, HVAC Method Statements, Method Statements

Method Statement for Water Tank Installation – GRP Water Tank

Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings, specifications and approved material submittal. Installation contractor shall properly coordinate with the civil

Method Statement for Water Tank Installation – GRP Water Tank Read More »

Method Statements, Plumbing Method Statements
uPVC Pressure piping system

uPVC High Pressure Water Supply Piping System Installation Procedure

Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place

uPVC High Pressure Water Supply Piping System Installation Procedure Read More »

Method Statements, Plumbing Method Statements, Pressure Testing
water spray system installation method statement

Water Spray Firefighting System Installation Method Statement

Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High Velocity Deluge Valve, OS & Y Valve Electrical Devices Pipe Wrenches Hammer Chisel

Water Spray Firefighting System Installation Method Statement Read More »

Construction Method Statements, Method Statements, Plumbing Method Statements
main-distribution-board MDB Testing Procedure

Main Distribution Board MDB Testing & Commissioning Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is

Main Distribution Board MDB Testing & Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning