Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

irrigation-system-piping

Method Statement Irrigation Systems Piping

Only approved material shall be used. Delivered material shall be stored at stores and shall always be subject to client’s representative inspection. Special shaded pipe racks shall be constructed to store pipes. Fittings and irrigation materials shall be stored inside containers that will be kept closed at all times. Transportation: All materials will be transported to […]

Method Statement Irrigation Systems Piping Read More »

Plumbing Method Statements

Epoxy Painting Method

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools involved in painting works are listed below. Paint Brushes/Roller Paint Sprayers as required

Epoxy Painting Method Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Plunge Column Construction Method Statement

PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management and Barricading SHE Measures. Design and Drawings Site Establishment Surveying Pre-excavation Boring into

Plunge Column Construction Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
pebble washing method statement

Pebble Wash Do It Yourself

There are many advantages of doing the pebble wash i.e. it is natural material, thus soothing to your eyes. It will not fade and no need to apply paint forever. It is aesthetically beautiful and good for edging or contrast for flooring pattern. Below are the steps that are helpful for doing yourself the pebble

Pebble Wash Do It Yourself Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method Statement for Earthwork Related to Track Work

Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench mark and existing ground level (EGL) all these have to be confirmed by

Method Statement for Earthwork Related to Track Work Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Construction site mobilization

Construction Project Site Mobilization Method Statement

Project starts from project mobilization. Once you win the project and client asks you to move your team you need certain documents for submission and approval. Site mobilization method statement is one of such requirement. Now a days most of the government entities require that all contractors must submit a plan which details how mobilization

Construction Project Site Mobilization Method Statement Read More »