Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery

Below sequence of operation is for Variable Volume Type FAHU with Plate Heat Recovery system. The system shall be variable volume package Fresh Air Handling Unit. The scope of the unit shall consist of: Supply Side accessories Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Plate Heat Exchanger Intake and discharge […]

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery Read More »

Building Management System, HVAC Method Statements, Testing & Commissioning

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements

Method Statement for Installation of GI Ducts for HVAC System

This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will be carried out and what health and safety issues and controls are involved.

Method Statement for Installation of GI Ducts for HVAC System Read More »

Duct Works, HVAC Method Statements
Reinforcement-Bars-requirement-sizes-and-weight

Concrete Reinforcement Standard Requirements and Specifications

All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the following. BS 4449: Carbon Steel Bars for Reinforcement of Concrete BS 8666-2000, BS EN

Concrete Reinforcement Standard Requirements and Specifications Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Loading-Platform-Construction-Method-Statement

Loading Platform Erection, Assembling and Installation Method Statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient erection and construction of Loading Platforms including assembling and installation for efficient and effective utilization of Platforms in execution of project works. Following tools / equipment shall be arranged. JCB Tower crane Props / jacks Loading platform (Pre

Loading Platform Erection, Assembling and Installation Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Demolition Method Statement for Building Structures or Services

Demolition requires very careful and safe method in order to make sure that persons involved and other related parties are protected from any hazards. Demolition may affect the public, workers and adjacent structures. Therefore a well defined procedure is necessary that will be strictly followed during the demolition work. The following method Statement describes the

Demolition Method Statement for Building Structures or Services Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements