Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Underground Piping Fabrication and Laying Method Statement

Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and relevant inspection for all underground piping works including relevant civil works at the […]

Underground Piping Fabrication and Laying Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Pressure Testing, Roadworks
Installation Testing & Commissioning Of BMS Building Management System

Building Management System BMS Installation Testing and Commissioning Method Statement

Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site, installation, testing & commissioning of the BMS system as described in the project

Building Management System BMS Installation Testing and Commissioning Method Statement Read More »

Building Management System, HVAC Method Statements, Method Statements, Testing & Commissioning
method statement for electrical wiring installation

METHOD STATEMENT FOR INSTALLATION OF WIRING DEVICES & CEILING ROSE

The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for installation of wiring devices & ceiling rose for electrical system through the guidelines contained herein so as to ensure that the job execution complies with the requirements of contract specification and serves the intended

METHOD STATEMENT FOR INSTALLATION OF WIRING DEVICES & CEILING ROSE Read More »

Electrical Method Statements, Method Statements
Roof Cladding Wall Cladding Method Statement

Roof Cladding | Wall Cladding Method Statement

Below is a precise method statement for installation of insulated roof cladding and wall cladding installation. List of necessary plant, machinery, materials and tools: Lifting Equipment 50 ton mobile crane (2 No.) 25 ton mobile crane (4 No.) 3 ton telescopic boom loader Scaffoldings Man lift Electrical equipment Generator Drill (110 volts) Screw gun Electrical

Roof Cladding | Wall Cladding Method Statement Read More »

Aluminium & Glass Work Methods, Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
excavation for pond construction

Civil Method Statement for Pond Work

This civil Method Statement defines the procedure to carry out the pond work as per requirements in project specifications to ensure the safety and quality of the work. Method statement covers excavation activity, rebar installation, formworks, concrete pouring, curing of concrete, formwork dismantling, finishing, and other civil work base on civil work item list. Subcontractor

Civil Method Statement for Pond Work Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Occupational Health and Safety

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans  Download Package Contains the Method Statement + Inspection & Testing Plan + Checklists for Pre Commissioning  + Checklists For Testing & Commissioning You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans Read More »

HVAC Method Statements, Testing & Commissioning
access control system installation

Access Control System Installation

This access control system installation method statement provides steps for the installation of access control security system in order for operatives to understand the work to be executed, how it is to be executed while making references to other technical standards and relevant national/international standards. Method statement covers installation of ACS access control system including brackets,

Access Control System Installation Read More »