This plumbing method of statement covers the installation of domestic water system piping and accessories. The procedure defines the method to ensure the installation work as per contract requirements, specifications and best practices. It gives details of how to carry out the
Read Complete Method
The purpose of this civil work method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for substructures in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and
Read Complete Method
The purpose of this Method Statement is to define the procedure for the cutting of piles to the approved cut off level. General sequence of work may include: Auger fitted with appropriate head Auger drilled into ground to required depth. Steel reinforcement
Read Complete Method
Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices.
Read Complete Method
This procedure is useful for building construction based upon the steel structure erection work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure work. The following items/equipments are
Read Complete Method