Category Archives: Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs and approved material submittals. Prior to installation of drainage accessories, the supervisor  and… Read More »

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is responsible in ensuring the implementation of construction procedure and method statement, supervising the… Read More »

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall ensure that the water stop works are carried out in accordance with company… Read More »

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work method statement is for rectification of the bulges in concrete in which chipping… Read More »

Fire Stop Work Installation & Application Method Statement

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE Plan Approved Material Management Plan Material approval for Fire stop work Technical Literature… Read More »

Method of Statement for Good Housekeeping in Construction Site

This standard document provides guidance on how to maintain a tidy place of work, free from avoidable hazards and an orderly working environment. Scope of the procedure covers all projects under the supervision of the organization. Project head along with discipline engineers including HSE are overall responsible for the implementation of this housekeeping method. Good… Read More »

Safe Operation of Abrasive Wheels / Power Tools For Cutting & Grinding

The purpose of this standard HSE procedure is to provide guidance on the safe operation and use of abrasive wheels used as high speed power tools for grinding and cutting operations on the construction sites or in the offices and house hold. Project management including project manager, HSE manager and discipline engineers are responsible for… Read More »

Method Statement for Casting of Capping Beam for Shoring Piles

The purpose and aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the capping beam work in compliance to standard and good practice at all stages and activities in the construction of capping beam for shoring works. This method statement applies to the construction of… Read More »