Category Archives: Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Method Statement for Excavation & Backfilling for Open Foundations / Footings

Below is a brief method statement that details general procedures to be followed for excavation & backfilling of foundations, Sub-structures & Trenches for any type of the construction and road project. The method covers survey works, excavation, backfilling, compaction and area cleaning after the completion of works. Separate work method statement, will be generated by… Read More »

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related standards and codes: ASTM A416/A416M: Standard Specification for Steel Strand, Uncoated Seven-Wire for… Read More »

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on… Read More »

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to provide a safe… Read More »

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information. The prestressing systems is STRONG FORCE (M) Multi Strand Bonded System using 15.24mm… Read More »

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and… Read More »

Installation Method Statement for Water Feature Piping Equipment and Accessories

Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality and site safety plan. They shall ensure that adequate resources and personnel are… Read More »

Method Statement for Structured Cabling System Installation

This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any contractor to carry out works under main contractor must comply with this method… Read More »