Category Archives: Civil Engineering Methods

Civil engineering is the core business of any construction company that works as a civil contractor. Our website provides best resources for civil engineering profession.
Civil construction engineers can download construction methodology , method statements covering ITP, check lists and risk assessments.
All our civil engineering documents are editable hence fulfilling the construction industry requirements, and helping engineers to grow in their engineering career.

Method Statement for Surveying Work

The purpose of this procedure is to follow proper activities of survey works for setting of grid lines & recording of existing ground level to carry out excavation and other works in all buildings in the project as per the technical specification and standards. It includes survey works for setting of grid lines & recording… Read More »

Method Statement for Bulk Earthworks

This Method Statement describes the works operation to undertake mass earthworks and sub grade construction that comply with the specified requirements for construction of new or widening of existing road under normal circumstances. The works covers all work in connection with the construction of cuts and fills including, Clearing and Grubbing, the removal to spoil… Read More »

Method Statement for Site Clearance Grubbing and Topsoil Removal

The purpose of this procedure is to outline the Site clearance, Grubbing and Topsoil removal. The detailed guide will provide the clear steps undertaken to complete the process of the site clearance activities in a safe, systematic and efficient manner in compliance to the statutory and environmental requirements. The procedure will include the removal and disposal of… Read More »

Construction Project Job Descriptions & Organization Chart

On this page you can find typical project organization chart and job descriptions of the project team. The job descriptions include: Project Manager Senior Project Engineer Architectural Coordination Engineer Planning Engineer Quantity Surveyor Safety Officer Quality Control Engineer Structural Engineer Civil Engineer Land Surveyor General Foreman Electrical Engineer Mechanical Engineer Understanding the job description in… Read More »

Soft landscaping method statement

This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel Crane Personal Protective Equipment: Safety Shoes Safety Helmets Hand Gloves Goggles Method Statement… Read More »

Plant Machinery Management & Maintenance Procedure

This method is applicable for all  fixed, transportable and mobile machinery and equipment used in the building, construction and earthworks activities of the company. Where plant resource is required on the projects, plant department will be contacted to provide equipment or services. At each project site, project plant coordinator shall ensure that processes are in… Read More »

Method Statement Irrigation Systems Piping

Only approved material shall be used. Delivered material shall be stored at stores and shall always be subject to client’s representative inspection. Special shaded pipe racks shall be constructed to store pipes. Fittings and irrigation materials shall be stored inside containers that will be kept closed at all times. Transportation: All materials will be transported to… Read More »

Epoxy Painting Method

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools involved in painting works are listed below. Paint Brushes/Roller Paint Sprayers as required… Read More »