Civil Engineering Methods

Civil engineering is the core business of any construction company that works as a civil contractor. Our website provides best resources for civil engineering profession.
Civil construction engineers can download construction methodology , method statements covering ITP, check lists and risk assessments.
All our civil engineering documents are editable hence fulfilling the construction industry requirements, and helping engineers to grow in their engineering career.

concrete repair shotcrete method statement

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy)

Concrete repair refers to modification of structure which is damage in its appearance or serviceability. It also involves to restore the structure partly or wholly, the pre-existing characteristics of serviceability, load-bearing capacity and if necessary, to improve its durability. Concrete structures deteriorate due to a number of processes leading to cracking and spalling of the […]

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy) Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works
excavation-requirements

Method Statement for Ground Preparation of Excavations & Service Trenches

This document covers excavation and ground preparation for the roadway and service trenches and shall include all excavation, shaping and sloping necessary for the construction, preparation and completion of all subgrade, shoulders, slopes, gutters, intersections, approaches, entrances and trenches in conformity to the alignment, grades, and cross-sections shown on the drawings or established by the

Method Statement for Ground Preparation of Excavations & Service Trenches Read More »

Civil Engineering Methods, Method Statement for Civil Works

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at site. If found the materials available at site, the foreman shall take permission

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Installation-of-Steel-Structure-method-statement

Procedure for Installation of Steel Structure for Pump Rooms

The following Method Statement describes the procedure and equipment required for the installation of steel structure for pump room. Following equipment shall be arranged: Lifting Equipment: Tower Crane (if available) To lift the beams/Purlins structure from ground floor to the roof where  the area of installation is located. JCB or Fork Lift To bring the beams

Procedure for Installation of Steel Structure for Pump Rooms Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Filling-Core-Sonic-Pipes

Procedure for Filling Core Sonic Pipes

The following describes the procedure for filling core sonic pipes with cement grout. Prepare the mix as per the proposed mix design given below using following equipment’s: Mixer Piston Pump Grout hose of suitable length Grout Mix Design For Filling Core Sonic Pipes For Grout Strength 30N/mm2 Mix  Design OD Weights MSRC (Type II) 1420 kg/m3

Procedure for Filling Core Sonic Pipes Read More »

Civil Engineering Methods, Method Statement for Civil Works
Temporary-Retaining-Wall-Installation-Method-Statement

Method Statement for Temporary Retaining Wall Installation

The existing ground level varies between + 3.52 m DMD to + 4.29 m DMD. The working platform level for Double U wall is considered at the average ground level. A Double U channel beam wall with one layer of tie-back anchors shoring system is proposed along the four sides of the plot for a

Method Statement for Temporary Retaining Wall Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works