This test procedure shall be carried out to detect the leak in shell weld joints and to observe the load stabilization of liquid in interval level height. During the hydro test, all instrumentation shall be excluded to avoid the damage to instruments.
Read Complete Method
The purpose of this method statement is to explain the various steps involved in lifting the Settling Tank shells by Jack Lifting Method. Prepare work permits, JSA and working procedure for approval prior to commencing work. Organize job safety meeting with all
Read Complete Method
Following Plant & Equipment to be arranged for the project fencing work. Tracked excavator Tractor and trailer Post driver Chainsaw Small tools (hammers, nail guns, wire cutters etc.) All personnel entering the site shall have received site safety induction and have attended a
Read Complete Method
Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice
Read Complete Method
Measurement of Structural excavation will be limited to excavation for foundation for bridges, retaining walls, box culverts or cross sectional area exceeding 1 sq. mtr, box culvert wing walls, head walls, toe walls and aprons, manholes, pump houses and sub-stations. For box
Read Complete Method
Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench
Read Complete Method
Project starts from project mobilization. Once you win the project and client asks you to move your team you need certain documents for submission and approval. Site mobilization method statement is one of such requirement. Now a days most of the government
Read Complete Method
Below is very brief road construction work method statement that outlines the complete process from laying the sub base to the laying of asphalt to achieve final product or outcome. The scope for pavement for the road construction consists of sub-base of
Read Complete Method