Installation Method Statement for Settling Tank Shells Using Jack Lifting Method

Hydro and Water Fill Up Test for Settling Tanks

This test procedure shall be carried out to detect the leak in shell weld joints and to observe the load stabilization of liquid in interval level height. During the hydro test, all instrumentation shall be excluded to avoid the damage to instruments. Since the hydro test is to be carried out by produced water, ensure […]

Hydro and Water Fill Up Test for Settling Tanks Read More »

Civil Engineering Methods, Method Statement for Civil Works
Installation of Fencing

Method Statement for Installation of Fencing

Following Plant & Equipment to be arranged for the project fencing work. Tracked excavator Tractor and trailer Post driver Chainsaw Small tools (hammers, nail guns, wire cutters etc.) All personnel entering the site shall have received site safety induction and have attended a job toolbox talk. The Fencing Site Engineer will issue a Permit to Dig

Method Statement for Installation of Fencing Read More »

Civil Engineering Methods, Method Statement for Civil Works

Method Statement For Spool Fabrication Of Steel Piping

The spool fabrication will be implemented with the sequence of marking, cutting, fit-up, welding, and painting. Marking All materials shall be marked for identification and traceability with respect to installation area, sheet number and spool number. The cut pipe spools shall be marked with their respective spool numbers, in accordance with the marked up fabrication

Method Statement For Spool Fabrication Of Steel Piping Read More »

Method Statements

Method Of Statement For Structural Excavation & Backfilling

Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice the nominal diameter of the pipe. Unless otherwise noted on the drawings, trenches

Method Of Statement For Structural Excavation & Backfilling Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements
excavation measurement procedure

Method of Measurement for Structural Excavations

Measurement of Structural excavation will be limited to excavation for foundation for bridges, retaining walls, box culverts or cross sectional area exceeding 1 sq. mtr, box culvert wing walls, head walls, toe walls and aprons, manholes, pump houses and sub-stations. For box culverts 1 sq. mtr or less, pipe culverts, storm sewers and ducts, measurement

Method of Measurement for Structural Excavations Read More »

Civil Engineering Methods

Method Statement for Earthwork Related to Track Work

Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench mark and existing ground level (EGL) all these have to be confirmed by

Method Statement for Earthwork Related to Track Work Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Construction site mobilization

Construction Project Site Mobilization Method Statement

Project starts from project mobilization. Once you win the project and client asks you to move your team you need certain documents for submission and approval. Site mobilization method statement is one of such requirement. Now a days most of the government entities require that all contractors must submit a plan which details how mobilization

Construction Project Site Mobilization Method Statement Read More »