Demolition-Method-Statement

Method Statement & Risk Assessment for Demolishing and Removal of Fence and Shelters

The purpose of this method statement is to illustrate how the existing fence and shelters will be removed from site in proper and safe way. The scope of this method of statement is to cover the demolishing methodology of the following: Chain link fence (internal & external) Shelters Toilet Tents Water station Lighting pole Road […]

Method Statement & Risk Assessment for Demolishing and Removal of Fence and Shelters Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements, Risk Assessment

Quality Assurance vs Quality Control – The Difference Between Them

Quality Assurance (QA) refers to the process used to create the deliverables, and can be performed by a manager, client, or even a third-party reviewer. Examples of quality assurance include management procedures, process checklists, project audits and methodology and standards development. Quality Control (QC) refers to quality related activities associated with the creation of project

Quality Assurance vs Quality Control – The Difference Between Them Read More »

Quality Management, Technical Articles
strainer installation method statement

Method Statement for Installation and Maintenance of Strainer

Strainers are installed to prevent foreign matter e.g. scale and dirt causing damage to pipeline equipment. Service temperature and pressure indicated on the identification plate or body marking should not be exceeded. Crane strainers have not been designed as fire safe pressure equipment. Strainers must be installed into a well-designed system and it is recommended

Method Statement for Installation and Maintenance of Strainer Read More »

Plumbing Method Statements
formwork safety components

Formwork Scaffolding Definitions and Terminologies

Below is list of very informative terms and definitions which are related to the formwork scaffolding. Every health and safety person must get familiar about these terminologies. ALIGNER Lumber or metal members used to align vertical formwork. (plumbing strut or alignment device) ANCHOR BRACKET A projecting member designed in combination with a specified anchor to

Formwork Scaffolding Definitions and Terminologies Read More »

Civil Engineering Methods, Technical Articles

Safety Procedures for GRP Pipeline Installation and Lamination

Below are detailed health and safety procedures for GRP pipeline installation and lamination works. The chemical components required for the butt-strap joints of GRP pipes present certain safety and health hazards if not handled well. Following are the recommendations: Common Hazards: Resin: Liquid resin contains styrene which is flammable. Its vapors may cause irritation of eyes,

Safety Procedures for GRP Pipeline Installation and Lamination Read More »

Occupational Health and Safety

Chemical Waste Disposal Method Statement

The purpose of this method statement is to ensure pollution free environment by proper disposal of chemical waste that are hazardous to health of personnel. The procedure is applicable to all personnel involved in processing of photosensitive film and handling of chemicals. Handling of chemicals shall comply with manufacturers’ instruction leaflet/stickers, data sheets supplied with

Chemical Waste Disposal Method Statement Read More »

Occupational Health and Safety
error: Content is protected !!
Scroll to Top