Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Concrete Casting, Placement, Curing and Defect Rectification Method

Below is a brief method statement that describes the practices and methods with regards to concrete placing, curing and defect rectification. Below is list of reference documents useful for this method statement. Contract specification cast in place in concrete Hazard Analysis table Inspection and Test Plan BS 8110 Concrete Placement: Complete all quality control checks […]

Concrete Casting, Placement, Curing and Defect Rectification Method Read More »

Construction Method Statements, Method Statement for Civil Works
structured cabling system testing requirements

Structured Cabling System SCS Testing and Commissioning Requirements

Below are brief guidelines that can be followed or considered for testing & commissioning of structured cabling system including voice, telephone and data systems. Characterizing the cabling system provides useful data for the support of future equipment application. The verification of the transmission performance of cable through field measurements results in a more professional hand

Structured Cabling System SCS Testing and Commissioning Requirements Read More »

Technical Articles, Testing & Commissioning

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects

This method statement details the method related to sequence of installation of electrical works in order to achieve the wild air cooling for under construction building of large projects. The installation of electrical works such as panel installation comprises the following activities. Site Clearance. Installation of necessary containment system. Area clearance for Electrical Room, Plant

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects Read More »

HVAC Method Statements, Method Statements

Laboratory Air Flow Control System & Fumes Hood Monitoring Testing and Commissioning

Below is the method statement description for performing the testing and commissioning of laboratory air monitoring and fumes hood system for any type of chemical and research laboratory. Scope of this method statement is testing and commissioning of laboratory air flow control system including the fumes hood monitoring system. Testing and commissioning shall ensure the

Laboratory Air Flow Control System & Fumes Hood Monitoring Testing and Commissioning Read More »

HVAC Method Statements, Testing & Commissioning

Emergency Lighting Monitoring System Testing and Commissioning

This method statement is for commissioning of Easi-Check Emergency Lighting Monitoring Systems comprising of both single and multiple EC2001 Easi-Check panels Stand Alone or Networked together complete with front end P.C. having Site Monitor/ graphics software installed. General Requirements Before works commence the engineer should have obtained certified copies of as ‘fitted drawings’ of the installation from the

Emergency Lighting Monitoring System Testing and Commissioning Read More »

Electrical Method Statements, Testing & Commissioning

LPG System Installation, Testing & Commissioning Method Statement

This mechanical method statement provides the details of site wide installation of LPG works for the project. Method statement also outlines the quality procedures for LPG works for the project. In addition this method statement is helpful to make the technicians aware of their exposure to the safety risk identified and explain them how to

LPG System Installation, Testing & Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning
Chlorination Method Statement For Domestic Water Supply Piping System

Chlorination Method Statement for Domestic Water Supply Piping System

This method statement provides guidance for carrying out the water supply system chlorination in accordance with the approved project quality plan, contract specifications and commissioning plan. Purpose of this Method Statement is to control the commissioning activities in line with the project quality plan and project commissioning specification requirements to achieve the optimum results. All

Chlorination Method Statement for Domestic Water Supply Piping System Read More »

Plumbing Method Statements, Testing & Commissioning