2022
Jan
11

Inspection and Test Requirements for In-Situ Concrete Placement

Inspection and Test Requirements for In-Situ Concrete Placement

This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix  details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on

2022
Jan
5

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

Steel Bar Rebar Reinforcement Cutting and Bending Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the

2022
Jan
3

Aggregate Impact Test to Find Aggregate Impact Value

Aggregate impact test Apparatus

The aim and purpose of aggregate impact test is to determine the impact value of the given aggregate which is to be used in road works. Toughness is the property of a material to resist impact. Due to traffic loads the road

2021
Dec
19

Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating

2021
Nov
22

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs

error: Content is protected !!