Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Demolition Method Statement for Building Structures or Services

Demolition requires very careful and safe method in order to make sure that persons involved and other related parties are protected from any hazards. Demolition may affect the public, workers and adjacent structures. Therefore a well defined procedure is necessary that will be strictly followed during the demolition work. The following method Statement describes the […]

Demolition Method Statement for Building Structures or Services Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
tiling work at walls

Method Statement For Installation Of Porcelain Tiles for Floors and Walls

Below is the detailed method statement For installation of tiles on floors and walls. Semi-Dry Mortar method is useful for floor tiles works and for wall thin-bed adhesive method is useful. The aim of this method statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard

Method Statement For Installation Of Porcelain Tiles for Floors and Walls Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Mast Climber Installation Method statement

Method Statement for Assembling Erection Installation & Management of Mast Climber

The Scope of this method statement covers all operations and associated activities involved in safe and efficient management of Mast Climber including assembling, erection, and installation for efficient and effective utilization in execution of project works. Following equipment shall be arranged: Tower crane Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required

Method Statement for Assembling Erection Installation & Management of Mast Climber Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements
installation method statement for Roof Shading Louvers

Method Statement for Installation of Roof Shading Louvers With Aluminium Cladding

Before starting the construction work, ensure that all necessary work permit and safety requirements are complete. Supervisor to check that safety personnel is available to monitor the construction activity before start of work. HSE site engineer/office will ensure monitoring of the applicable PPE and especially the safety harness for all persons concerned with working at

Method Statement for Installation of Roof Shading Louvers With Aluminium Cladding Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements
concrete repair shotcrete method statement

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy)

Concrete repair refers to modification of structure which is damage in its appearance or serviceability. It also involves to restore the structure partly or wholly, the pre-existing characteristics of serviceability, load-bearing capacity and if necessary, to improve its durability. Concrete structures deteriorate due to a number of processes leading to cracking and spalling of the

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy) Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works
Scroll to Top