Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Steel Bar Rebar Reinforcement Cutting and Bending Procedure

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or […]

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating manual and cartridge operating manual. Hazard Identification and Risk Assessment The introduction of

Explosive Power Tools Operation Safety Instructions Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Technical Articles
Excavation Work Guidelines for Irrigation and Water Supply Projects

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is responsible in ensuring the implementation of construction procedure and method statement, supervising the

Excavation Work Guidelines for Irrigation and Water Supply Projects Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall ensure that the water stop works are carried out in accordance with company

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Concrete Bulging Repair Method Statement

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work method statement is for rectification of the bulges in concrete in which chipping

Concrete Bulging Repair Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Scroll to Top