Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Plastering Method Statement

Plastering Method Statement

The purpose of this Method Statement is to illustrate how plastering work is to be carried out with safework implementation. Plastering method statement defines the methodology of all kind of plastering works related to a construction project covering the main contractor works. This civil method statement also addresses the type and extent of inspections, ITP […]

Plastering Method Statement Read More »

Civil Engineering Methods, Method Statement for Civil Works
Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

This method statement is applicable for the Testing & Commissioning of Fan Coil Units for the project as mentioned in the project specifications & approved shop drawings. Before commencement of FCU testing & commissioning activity, the supervisor must ensure that pre-commissioning of the FCU is complete and approved. Also make sure that all Installations &

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement Read More »

Construction Method Statements, HVAC Method Statements, Method Statements, Testing & Commissioning

Control Valve & Actuator Installation Method Statement for HVAC System

The purpose of below instrument installation method statement is to set out a clear and defined method of ensuring that the correct control valve is selected and installed in the correct position in the HVAC system. In addition a method is also set out which will ensure that the correct actuators for each specific control

Control Valve & Actuator Installation Method Statement for HVAC System Read More »

HVAC Method Statements, Method Statements
installation-of-Industrial-Exhaust-Fans

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans)

Below is a precise exhaust fan installation procedure that covers installation of Axial, Centrifugal and Propeller types of exhaust fans. This standing procedure step wise defines the method that will help to ensure that installation of axial / centrifugal / propeller fan’s, supports, vibration isolators and final connections is done as per project specifications. Also

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans) Read More »

Duct Works, HVAC Method Statements

Method of Statement For Installation of Compressed Air Piping System for Chillers

1. PURPOSE This method of statement covers the on construction project site installation of the compressed air piping system for the operation of the chillers. This method statement covers following type of works: Power Plant Compressed Air Systems Factory assembled packaged air compressor complete with: –  Rotary screw air compressor –  Receiver –  Filtration facilities – 

Method of Statement For Installation of Compressed Air Piping System for Chillers Read More »

Plumbing Method Statements
Scroll to Top