Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Download Method Statement for Installation of Aluminium Cladding Works

Download Method Statement for Installation of Aluminium Cladding Works  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that […]

Download Method Statement for Installation of Aluminium Cladding Works Read More »

Method Statement for Civil Works
Method Statement for Installation of Central Battery System CBS

Download Central Battery System Installation Method Statement Package

Professional Method Statement for Central Battery System Installation, Emergency Lighting Integration & Electrical QA/QC Documentation Looking for a complete and consultant-approved Central Battery System Installation Method Statement package? This professionally prepared documentation package is specially designed for electrical contractors, ELV contractors, MEP companies, QA/QC engineers and project teams involved in installation of Central Battery Systems

Download Central Battery System Installation Method Statement Package Read More »

Electrical Method Statements

Closed Control Units Installation Testing Commissioning Method Statement

Below is the best method statement that covers closed control units installation testing and commissioning on a project site. The mechanical site engineer / site supervisor will give necessary instructions to tradesmen (pipe fitters & duct installers) and provide necessary approved construction/shop drawings of latest revision along with coordinated layouts for ccu installation works. Following

Closed Control Units Installation Testing Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements
Fire Fighting pipe painting procedure method statement

Painting Procedure for Firefighting and Fire Protection Piping Network

This method of statement covers the painting procedure of firefighting and fire protection pipe, fittings and accessories for any kind of construction project. The pipe painting procedure defines the method used to ensure the painting has been carried out as per contract specifications and industry best practices. It gives details of how the work will

Painting Procedure for Firefighting and Fire Protection Piping Network Read More »

Fire Suppression System, Piping Method Statements
Method Statement for Installation of Noise Control and Vibration Isolation Equipment

Method Statement for Installation of Noise Control and Vibration Isolation Equipment

This method statement covers on site installation of noise control and vibration isolator equipment associated with all rotating, centrifugal and reciprocating equipment i.e. pumps, chillers, air handling units and pipe connections etc. Procedure defines the steps that will be used to ensure the correct installation of noise control equipment to avoid excess noise and vibration

Method Statement for Installation of Noise Control and Vibration Isolation Equipment Read More »

Construction Method Statements, Method Statements

Method Statement for Application Of Bitumen Paint

Below is the systematic procedures for the various activities required for application of Bitumen Paint to ensure that all works are carried out in accordance with manufacturer’s recommendations. Arrange approved construction drawings and project specifications before start of the work. Surface Preparation Procedure: Surface shall be clean, dry and free from loose particles before application

Method Statement for Application Of Bitumen Paint Read More »

Method Statement for Civil Works
Clean Agent Fire Suppression System Best Installation Method Statement

Room Integrity Test For Fire Suppression System FM-200 Inergen Vesda Novec

The objective of this document is to ensure that the room integrity tests in the 200 Bar gas fire extinguishing protected rooms are carried out correctly. FM200 room integrity test will ascertain, whether the room will retain the design concentration of the FM 200 or Inert fire suppression gas for a period of 10 minutes.

Room Integrity Test For Fire Suppression System FM-200 Inergen Vesda Novec Read More »

Fire Suppression System, Testing & Commissioning