Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Method of Statement for Protection Screed of Waterproofing Membrane

Download Wet Area Waterproofing Method Statement Package

Professional Waterproofing Installation Procedure for Bathrooms, Toilets, Kitchens & Wet Areas Ensure leak-free construction and consultant-approved waterproofing works with this professionally prepared Wet Area Waterproofing Method Statement package. This complete documentation package is designed for contractors, waterproofing specialists, QA/QC engineers and project teams handling residential, commercial and industrial waterproofing applications. The package includes all required […]

Download Wet Area Waterproofing Method Statement Package Read More »

Method Statement for Civil Works

Download Method Statement for Testing & Commissioning of Closed Control Units CCU

Testing and commissioning of Computer Room Air Conditioners (CRAC) and Close Control Units (CCU) shall be performed by qualified commissioning personnel using calibrated instruments, approved procedures, and manufacturer-recommended practices. All activities shall verify the mechanical integrity, refrigeration performance, chilled water performance, electrical safety, environmental control accuracy, alarm functionality, BMS integration, and redundancy sequences of the

Download Method Statement for Testing & Commissioning of Closed Control Units CCU Read More »

HVAC Method Statements, Testing & Commissioning

Download Cooling Tower Testing & Commissioning Method Statement Package

Professional Testing & Commissioning Procedure for Cooling Towers & HVAC Systems Looking for a complete and consultant-approved Cooling Tower Testing & Commissioning Method Statement package? This professionally prepared documentation package is specially designed for HVAC contractors, MEP companies, commissioning engineers and QA/QC teams involved in testing and commissioning of cooling towers for commercial, industrial and

Download Cooling Tower Testing & Commissioning Method Statement Package Read More »

HVAC Method Statements, Testing & Commissioning

SMATV Installation Method Statement Including Testing

Below are the steps or method statement for SMATV installation & testing for complete SMATV system in a building or project. PURPOSE: The purpose of this method statement is to identify the requirements for installation & testing of SMATV system as per the contract specification, drawings and as per the applicable regulations if any. SCOPE: This

SMATV Installation Method Statement Including Testing Read More »

Electrical Method Statements

Method Statement – Painting Works

Below is the painting method statement procedure for doing the painting works for internal wall painting. This document outlines a comprehensive safe work method statement for internal wall painting. It specifies required tools, health and safety protocols, and preparation procedures, including surface cleaning and defect repairs. It emphasizes protective equipment, proper handling of materials, and

Method Statement – Painting Works Read More »

Method Statement for Civil Works
Underground Chemical Waste Tank Installation Method Statements

Download Method Statement For Installation of Underground Chemical Waste Tank

Download Method Statement For Installation Of Underground Chemical Waste Tank  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of

Download Method Statement For Installation of Underground Chemical Waste Tank Read More »

Method Statement for Civil Works, Plumbing Method Statements
Dehumidifier Installation Method Statement

Dehumidifier Installation Method Statement

This method of statement describes the methodology and procedure for the dehumidifier installation for an HVAC installation project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable safety and quality procedures, project documents and specifications. The document covers

Dehumidifier Installation Method Statement Read More »